At Altınyaldız, the production details of the purlins and columns

At Altınyaldız, the production details of the purlins and columns

At Altınyaldız, the production details of the purlins and columns used in our space frame systems are exclusively designed and applied by our company.


Hello, my name is Selçuk Ergün. I joined the Altınyaldız International Space Systems Construction Inc. family in January 2003, and since then I have been continuously serving in my role. I take great pride in contributing to our company’s vision, which is built on production excellence and a strong focus on quality.

What truly distinguishes Altınyaldız from other companies is the deep sense of belonging among its employees, the long-standing collaboration, and the genuine spirit of teamwork that has been sustained over the years. Throughout my career here, I have prepared bid drawings, shop drawings, and steel fabrication projects, and I continue to work extensively in these areas. Today, I am primarily focused on fabrication projects, in which I have developed significant expertise.

At Altınyaldız, the production details of the purlins and columns used in our space frame systems are exclusively designed and applied by our company. Fabrication is a highly precise process, requiring rigorous attention at every stage. Before production begins, we carefully perform all general inspections. Purlin sections are drawn in full compliance with the project requirements before moving on to the next step. At this stage, sphere diameters are marked, and columns are positioned with exact alignment to these dimensions. Meanwhile, the clearances between the purlins and the space frame pipes are meticulously checked to avoid any collision.

Following these controls, we proceed to the classification of the purlins and the preparation of work orders. These work orders are issued by taking into account the section types, module dimensions, and protrusion values specified in the project details. For example,

The most critical aspect of this process is the careful inspection at every stage, with particular emphasis on verifying sections and measurements, which is absolutely essential. After the purlin work order is completed, we move on to the column work order. In this stage, the key factors include the purlin section, height, and the connection details of the purlins. The placement of single-hole and double-hole brackets is determined precisely, and the classification of columns is carried out accordingly.

During classification, single columns are carefully assigned odd numbers, while double columns are assigned even numbers. Once all inspections of the column fabrication are completed, the finalized work orders are converted into PDF format and sent to our factory via email. Only after these steps do we proceed to the production phase.

 

This article reflects a brief summary of the production culture I have experienced throughout my more than 20 years of service at Altınyaldız. The most valuable lesson I have learned here is that a good system is not sustained by machines alone, but by the dedication and commitment of the people who believe in it.

 

Sincerely,
SELÇUK ERGÜN

 